C. Steinweg Logistics Expands Storage Capacity with Rapidly Deployed BlackBull Temporary Structures

Logistics

Industry

3162m2

Size

60 days

Timeframe

BlackBull | Number 2

Structure Used

Turnkey Solutions for Temporary Structures

C. Steinweg Logistics, a global leader in logistics and warehousing solutions, faced a critical need for expanded bonded warehouse space to accommodate growing business demands. To meet this challenge quickly and efficiently, they turned to Basboga and our BlackBull innovative steel-framed temporary structures. This case study details how two massive BlackBull structures, totalling 3162 sqm, were delivered and installed within a remarkable 60-day timeframe, providing C. Steinweg with the necessary storage capacity, thermal comfort, and condensation control required for their operations.

The Challenge & Solution

C. Steinweg Logistics is a globally recognised service provider in the logistics industry. With operations spanning across continents, they specialise in handling, storing, and adding value to various commodities. Their commitment to efficiency, reliability, and customer satisfaction has made them a trusted partner for businesses worldwide.

C. Steinweg Logistics found itself facing a significant challenge: a rapid increase in demand for bonded warehouse space. This surge in demand, outpaced their existing capacity. They swiftly realised the need for increased storage space to meet this demand promptly so it didn’t pose a threat to their business growth and operational efficiency. A traditional construction approach was not feasible due to time constraints and potential disruption to ongoing operations.

The Solution

To address this urgent need, C. Steinweg Logistics chose Basboga’s BlackBull steel-framed temporary structures. These structures offered the perfect combination of speed, quality, and cost-effectiveness. The two massive structures, each boasting dimensions of 31m wide by 51m long with a 12.5m ridge height, provided a combined 3162 sqm of storage space. Crucially, Basboga was able to manufacture, deliver, and install these structures within an impressive 60-day timeframe. The inclusion of insulation and an inner liner further ensured a comfortable working environment and protected stored goods from condensation.

Conclusion

The C. Steinweg Logistics case study exemplifies the effectiveness of Basboga’s temporary structures in addressing urgent capacity needs. By choosing Basboga, C. Steinweg successfully expanded its operations quickly, cost-effectively, and without compromising on quality or functionality. This project underscores the value of temporary structures as a flexible and efficient solution for businesses facing dynamic growth and evolving storage requirements. 

It also showcases Basboga’s commitment to delivering high-quality, rapidly deployable solutions that meet the specific needs of its clients.


Table of Contents

Table of Contents

Looking for a Fast Storage Solution? 

Facing similar challenges with storage capacity or rapid expansion? Contact Basboga today to learn how our steel-framed temporary structures can provide you with a fast, flexible, and cost-effective solution.

More Case Studies

Polesie Toys Enhances Storage Capacity and Operational Efficiency with BlackBull Temporary Structures

Temporary Structure Solutions for Manufacturing Polesie Toys, a leading manufacturer of high-quality toys, required a significant expansion of their storage facilities to support their growing production and distribution needs. To meet this demand swiftly and effectively, they partnered with Basboga, a leading producer and supplier of temporary structures, and implemented

Read More »

Get in Touch

Our team of experts are ready to help you find the perfect solution for your needs. Request a quote or schedule a consultation to get started.

Footer Form